|
|
|
| Company Name |
|
Project Title |
|
|
|
| Abhishek Industries |
- |
Reduction in steam consumption to generation ratio |
|
|
|
| Apollo Tyres |
- |
Reduction of Cured Tyre Defects |
|
|
|
| DBOI Global Services |
- |
Driving Mindset and Culture Change through LEAP (Lean Excellence Activity Programme) at Deutsche Bank |
|
|
|
| Firstsource Solutions |
- |
Reducing transfers |
|
|
|
| Godrej & Boyce, Mohali |
- |
To Eliminate Jam / High current Defect in Compressors |
|
|
|
| Godrej & Boyce, Satara |
- |
Reducing warranty cost in washing mc (Mechanical assembly) |
|
|
|
| HDFC Bank |
- |
Setting up of Rural BPO at Tirupati - Financial Inclusion and Connecting India |
|
|
|
| HDFC Bank |
- |
Shock and Awe – ‘Improving TAT (Turn around time) for Loan Disbursements' |
|
|
|
| Hindalco Industries, Copper |
- |
Improvement in Converter blow time |
|
|
|
| Hindustan Zinc |
- |
Reduction in Turn Around time of Rake Unloading |
|
|
|
| ICICI Prudential Life Insurance |
- |
Medical Business Loss Reduction |
|
|
|
| ICICI Prudential Life Insurance |
- |
Increasing Contactability & Productivity at Outbound Call Centre |
|
|
|
| Kansai Nerolac Paints, Lote Parshuram |
- |
Tinting Stroke Reduction |
|
|
|
| Larsen & Tubro, Hazira |
- |
Reduction in wastage of Natural Gas |
|
|
|
| Max New York Life Insurance |
- |
Enhancing Effectiveness of Renewals Communication |
|
|
|
| Moser Baer Photo Voltaic |
- |
To reduce the breakage of Solar Cells from Laser to Shrink Wrap section, from the level of 5% to within 2.5% at throughput rate of 3000 cells per hr. |
|
|
|
| Motilal Oswal |
- |
Account opening TAT Reduction |
|
|
|
| Piramal Healthcare |
- |
Energy Management in Piramal Healthcare Manufacturing Plants |
|
|
|
| Reliance Industries |
- |
Improvement in PVC prime quality from 98.5% to 98.9% by September’ 2009 |
|
|
|
| Reliance Infrasturcture |
- |
Reduction in tripping of Condenser cooling water pump by 50% |
|
|
|
| Secure Meters |
- |
Improve First Time Yield (FTY) of ICM-300 Products on Test Equipment |
|
|
|
| Sterlite Industries, Tuticorin |
- |
To reduce stack out time from 41min to 32 min |
|
|
|
| TCS BPO |
- |
Improve Underwriting Accuracy |
|
|
|
| Titan Industries |
- |
Lean Retailing |
|
|
|
| Yes Bank |
- |
Straight through Processing (STP) % Improvement in Trade Services |